Understanding projects

Understanding projects

Postjamm organizes your work in a simple structure:

  • Folder: Used to group related projects
  • Project: A single video or asset you are working on
  • Versions: Different iterations of the same project
  • Notes: Instructions or references for your team
  • Comments: Feedback added directly on the video

This structure helps you keep all your work, feedback, and revisions organized in one place.

    • Related Articles

    • Working with projects in Postjamm

      Understanding projects Postjamm organizes your work in a simple structure: Folder: Used to group related projects Project: A single video or asset you are working on Versions: Different iterations of the same project Notes: Instructions or references ...
    • User management

      The users tab lets you invite and manage people in your workspace. The number and type of users you can invite depends on your plan. Team plan Includes: 5 team members 0 collaborators Team members have access to the workspace, including folders and ...
    • Where to view storage usage

      Postjamm shows storage indicators across the product, so you can keep track of usage easily. You can view storage usage in: Top navigation: Shows overall workspace storage usage Folders: Shows total storage used by all projects inside the folder ...
    • How storage works

      Postjamm storage is calculated based on the total minutes of footage stored in your workspace, not the file size in GB. This means your storage usage depends on video duration, including all uploaded versions inside your projects. Here’s how it works ...
    • Best practices for managing storage

      Review storage usage regularly from the top navigation Check folder-level usage to find storage-heavy client work Check project-level usage when many versions are uploaded Remove old versions that are no longer needed Increase storage before starting ...